Block Moving – Tees Barrage April 22nd

Today (22nd April 2012) was the third opportunity to move the blocks on the short course. The aim of today was the collection of data to enter into and verify a computer based model. Ultimately it is hoped that the model will allow different scenarios to be tested without the need for the heavy lifting.

A small crew of five shifted the blocks today.

More than a hundred of images from today can be found on the Unsponsored Flickr Stream.

Posted in

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.